Consultancy projects from 2008 - 2013
|
|
S No
|
Project Title
|
Organization
|
Period
|
Budget
|
PI
|
Co-PI
|
|
|
|
Starting year
|
Completion
|
Duration
|
|
|
|
1
|
THEORETICAL STUDIES ON THE CONFIGURATION DESIGN OF FSAPDS STABILIZER UNIT STABILITY ANALYSIS AND SABOT SEPARATION DYNAMICS
|
ARDE
|
3/15/2008
|
3/14/2009
|
1
|
979464
|
A K Ghosh
|
|
2
|
3DFE ANALYSIS OF ALH MAIN ROTOR BLADE COLLAR
|
HAL
|
12/18/2008
|
3/31/2012
|
4
|
772475
|
C Venkatesan
|
|
3
|
TRAJECTORY AND STABILITY ANALYSIS OF CONVENTIONAL PARACHUTE PAYLOAD COMBINATION FOR FAE
|
ADRDE
|
2/27/2009
|
12/31/2010
|
1
|
972846
|
A K Ghosh
|
|
4
|
DYNAMICS STABILITY ANALYSIS OF AEROSTAT 2000 CUM SIZE
|
ADRDE
|
2/27/2009
|
12/31/2010
|
1
|
992700
|
A K Ghosh
|
|
5
|
AERODYNAMIC STUDIES AND CHARACTERISATION OF 120MM...BOMB(RAB)
|
ARDE
|
3/5/2009
|
3/31/2010
|
1
|
1186500
|
A K Ghosh
|
|
6
|
DEVELOPMENT AND CHARACTERIZATION OF SLINGER COMBUSTOR
|
PWC
|
5/11/2009
|
5/10/2013
|
4
|
7200000
|
Abhijit Kushari
|
|
7
|
SEPARATION AND STABILITY STUDIES OF 250KG PRE- FRAGMENTED BOMB.
|
ARDE
|
6/8/2009
|
6/7/2010
|
1
|
997000
|
A K Ghosh
|
8
|
DESIGN OF AERODYNAMIC SHAPE OF CABS OF WAP7 LOCOMOTIVES
|
HEWPL
|
8/5/2009
|
3/31/2010
|
1
|
71736
|
Sanjay Mittal
|
9
|
ACQUISITION OF FLIGHT DATA FOR RAM AIR PARACHUTE
|
ADRDE
|
3/29/2010
|
12/31/2011
|
1
|
913284
|
A K Ghosh
|
10
|
ESTIMATION OF FLIGHT CHARACTERISTICS OF RAM AIR PARACHUTE
|
ADRDE
|
3/31/2010
|
12/31/2011
|
1
|
860340
|
A K Ghosh
|
11
|
FLIGHT LAB TRAINING PROGRAM FOR PRIVATE ENGGINEERING COLLEGE
|
MIS
|
4/1/2010
|
3/31/2015
|
5*
|
12843744
|
A K Ghosh
|
12
|
DEVELOPMENT OF COMPUTATIONAL AEROELASTICITY CODE FOR HELICOPTER ROTOR LOADS AND DYNAMIC RESPONSE ANALYSIS
|
HAL
|
7/1/2010
|
6/30/2014
|
4*
|
5574000
|
C Venkatesan
|
13
|
DESIGN OF PARACHUTE ASSISTED UNMANNED AERIAL VEHICLE
|
ADRDE
|
7/28/2010
|
7/27/2013
|
3
|
992700
|
A K Ghosh
|
None
|
14
|
DEVELOPMENT OF ARTIFICIAL NEURAL NETWORK BASED CONTROL LOW FOR PARACHUTE ASSISTED UAV
|
ADRDE
|
8/1/2010
|
7/31/2013
|
3
|
965000
|
A K Ghosh
|
None
|
15
|
RESEARCH WORK ON STRATOSPHERIC AIRSHIP
|
ADRDE
|
9/27/2010
|
12/31/2011
|
1
|
703100
|
A K Ghosh
|
None
|
16
|
DESIGN AND DEVELOPMENT OF CONTROL ALGORITHM USING ARTIFICAL NEURAL
|
ADRDE
|
3/10/2011
|
3/9/2014
|
3*
|
990000
|
A K Ghosh
|
None
|
17
|
DESIGN AND FABRAICATION OF A REFLEX AEROFOIL BY USING COMPOSITES
|
ADRDE
|
3/10/2011
|
3/9/2014
|
3*
|
990000
|
A K Ghosh
|
None
|
18
|
AERODYNAMIC CHARACTERIZATION OF A UAV THROUGH FIGHT TEST
|
ADRDE
|
3/10/2011
|
3/9/2014
|
3*
|
990000
|
A K Ghosh
|
None
|
19
|
GLIDER BASED PAYLOAD (TORPEDO) DELIVERY SYSTEM
|
DRDO
|
4/20/2011
|
12/31/2012
|
1
|
965125
|
A K Ghosh
|
None
|
20
|
THEORETICAL STUDY ON UNDER WATER DYNAMICS AND HYDRO-BALLISTICS FOR ANTI-SUBMARINE ROCKET
|
ARDE
|
5/9/2011
|
12/31/2012
|
1
|
997000
|
A K Ghosh
|
None
|
21
|
GPS INS BASED CONTROL SYSTEM INTEGRATED AND GLIDER TORPEDO KIT
|
NSTL
|
6/24/2011
|
12/31/2012
|
1
|
992700
|
A K Ghosh
|
None
|
22
|
CHARACTERIZATION OF FOG GENERATORS
|
FHPL
|
10/17/2011
|
12/17/2011
|
1
|
115815
|
Abhijit Kushari
|
None
|
23
|
LIMITED WIND TUNNEL TESTING FOR GENERATION OF LONGITUDINAL, STABILITY AND CONTROL CHARACTERISTICS
|
NSTL
|
1/5/2012
|
1/4/2013
|
1
|
965125
|
A K Ghosh
|
None
|
24
|
DESIGN AND FABRICATION OF A FLYING WING VERTICAL TAILLESS ADAPTED AURA UCAV MODEL
|
ADA
|
2/7/2012
|
12/31/2012
|
1
|
758500
|
A K Ghosh
|
None
|
25
|
PASSIVE AND ACTIVE CONTROL OF HOOTING
|
PWC
|
3/12/2012
|
3/11/2014
|
2*
|
11562500
|
Abhijit Kushari
|
None
|
26
|
WIND TUNNEL STUDY OF CHIMNEY FOR KRISHNAPATNAM TPS
|
BGRES
|
4/1/2012
|
12/31/2013
|
1
|
1323600
|
Kamal Poddar
|
None
|
27
|
LOW SPEED WIND TUNNEL TEST ON HELINA MISSLIE
|
DRDL
|
4/1/2012
|
5/31/2014
|
2*
|
1320000
|
Kamal Poddar
|
None
|
28
|
WIND TUNNEL MODEL STUDY FOR NCDT PRAYAGRAJ TPS
|
PAHAR
|
4/1/2012
|
3/31/2014
|
2*
|
2696640
|
Kamal Poddar
|
None
|
29
|
WIND TUNNEL STUDY OF CHIMNEY FOR SKS TPS
|
CETHAR
|
4/1/2012
|
12/31/2013
|
1
|
1220098
|
Kamal Poddar
|
None
|
30
|
WIND TUNNEL STUDY OF CHIMNEY FOR HALDIA TPS
|
BHARAT
|
4/1/2012
|
3/31/2013
|
1
|
764379
|
Kamal Poddar
|
None
|
31
|
ANALYSIS OF COMBUSTION PRODUCTS FROM BURNING OF INCENSE
|
DTL
|
4/16/2012
|
7/15/2012
|
1
|
20000
|
D P Mishra
|
None
|
32
|
HIGH SPEED WIND TUNNEL TESTING OF 120MM FSAPDS MK-II AMMUNITION
|
ARDE
|
4/17/2012
|
4/16/2014
|
2*
|
905000
|
Abhijit Kushari
|
None
|
33
|
DATA FOR JETS AND SPRAYS IN CROSS FLOW
|
P&W
|
4/17/2012
|
4/16/2014
|
2*
|
3634165
|
Abhijit Kushari
|
None
|
34
|
WIND TUNNEL MODEL STUDY OF CHIMNEY FOR TUTICORIN TPS
|
IBPIL
|
4/18/2012
|
12/31/2013
|
1
|
1179780
|
Kamal Poddar
|
None
|
35
|
NON-LINEAR MODELING, SIMULATION AND INSTRUMENTATION THROUGH FLIGHT TRIAL DATA ACQUISITION AND DATA ANALYSIS AND TRIAL OF 2000 CUM AEROSTAT
|
ADRDE
|
8/3/2012
|
2/2/2014
|
2*
|
8708000
|
A K Ghosh
|
None
|
36
|
WIND TUNNEL STUDY OF NDCT & CHIMNEY FOR NELLORE TPS
|
NCC
|
9/24/2012
|
12/31/2013
|
1
|
2921360
|
Kamal Poddar
|
None
|
37
|
MODEL DESIGN, DATA ANALYSIS AND REPORTING FOR L&T VISA POWER TPS AT CHATTISGARH
|
L&T
|
9/27/2012
|
12/31/2013
|
1
|
404496
|
Kamal Poddar
|
None
|
38
|
WIND TUNNEL STUDY OF CHIMNEY FOR SIKKA TPS
|
BHEL
|
11/23/2012
|
11/22/2013
|
1
|
1213300
|
Kamal Poddar
|
None
|
39
|
MISCELLANEOUS ACCOUNT
|
MISC
|
2/19/2013
|
2/18/2018
|
5*
|
5831315
|
Kamal Poddar
|
None
|
40
|
CHECKING OF STRUCTURAL DESIGN AND DRAWING OF FRP SHELTER BARREL TYPE (5-6 MEN)
|
AR POL
|
4/2/2013
|
10/1/2013
|
1
|
157024
|
Sanjay Mittal
|
None
|
41
|
GAS TURBINE ENGINE COMBUSTION CHARACTERISATION BY USING FIXED LASER ENERGY SOURCE
|
GTRE
|
4/12/2013
|
2/11/2014
|
1*
|
885000
|
D P Mishra
|
42
|
WIND TUNNEL STUDY OF CHIMNEY FOR RAICHUR TPS
|
GANNON
|
5/6/2013
|
5/5/2014
|
1*
|
1235960
|
Kamal Poddar
|
43
|
WIND TUNNEL STUDY OF CHIMNEY FOR SHIRPUR TPS
|
SIMPLE
|
5/6/2013
|
5/5/2014
|
1*
|
1235960
|
Kamal Poddar
|
44
|
WIND TUNNEL STUDY OF CHIMNEY AND NDCT FOR 2X660 MW CHHABRA TPS
|
L&T
|
6/26/2013
|
6/25/2014
|
1*
|
3033720
|
Kamal Poddar
|
45
|
WIND TUNNEL TESTING OF RCC CHIMNEY FOR BELLARY TPS
|
BHEL
|
8/12/2013
|
8/11/2014
|
1*
|
1235960
|
Kamal Poddar
|
46
|
WIND TUNNEL STUDY OF CHIMNEY FOR SAP-C PROJECT AT PPL
|
SIMON
|
10/3/2013
|
10/2/2014
|
1*
|
1797760
|
Kamal Poddar
|