Electrical |
Fire safety and BMS work for New HPC (High Performance Capacity) facility under NSM (National Super Computing Mission) Data center at Computer Centre, IIT Kanpur |
21/Fire safety & BMS/2018/573 |
6,487,980.00 |
15.10.2018
3.30 PM |
22.10.2018
3.30 PM |
|
|
Air conditioning |
Supply and laying of MS pipe to feed chilled water to SL-214 |
08/AC/EE/2018/231 |
103,829.00 |
10.10.2018
3.00 PM |
10.10.2018
3.30 PM |
Terms & Conditions |
List of Approved make AC |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 10.10.2018 upto 3.00 PM. |
|
|
Air conditioning |
Supply of desktop computer |
07/IWD/CO/2018/228 |
-- |
08.10.2018
3.30 PM |
08.10.2018
3.30 PM |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 08.10.2018 upto 3.00 PM. |
|
|
Air conditioning |
Dismantling & installation of old/new hi wall split type AC's/ water cooler with associated works at WLE 320, FB 218, SL 216, Director Office, Aerospace, flight lab, International building & smart city etc. |
06/AC/EE/2018/227 |
43,075.00 |
08.10.2018
3.30 PM |
08.10.2018
3.30 PM |
Terms & Conditions |
List of Approved make AC |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 08.10.2018 upto 3.00 PM. |
|
|
|
Air conditioning |
Installation of new hi wall split type AC's with associated works at BSBE, WL & Bio Materials lab & PK kelkar library |
05/AC/EE/2018/226 |
60,929.00 |
08.10.2018
3.30 PM |
08.10.2018
3.30 PM |
Terms & Conditions |
List of Approved make AC |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 08.10.2018 upto 3.00 PM. |
|
|
Civil Work |
Creating of shed for RO plant on roof with RO treated water line at Hall-8 near mess |
30/C/D1/2018-19/01 |
336065.00 |
06.10.2018
3.30 PM |
09.10.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 134, 1033, 1039 and 1081 Type-I |
29/C/D1/2018-19/01 |
707913.00 |
15.10.2018
3.30 PM |
17.10.2018
3.30 PM |
|
|
Civil |
Renovation of High Speed Aerodynamic Lab of Aerospace Department. |
16/Civil/D2/2018-19/2 |
8,34,939.00 |
03.10.2018
3.30 PM |
05.10.2018
3.30 PM |
|
|
Civil |
Water proofing of roof L-7 in LHC. |
16/Civil/D2/2018-19/1 |
6,14,070.00 |
03.10.2018
3.30 PM |
05.10.2018
3.30 PM |
|
|
Air Conditioing |
Dismantling & installation of new hi wall split type AC's with associated works at BSBE lab no. 14, Northern Lab room no. 307. |
04/AC/EE/2018/204 |
93,337.00 |
04.10.2018
3.00 PM |
04.10.2018
3.30 PM |
Terms & Conditions |
List of Approved make AC |
BOQ |
Corrigendum |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 25.09.2018 upto 3.00 PM. |
|
Electrical |
Repair and painting of damage/defective geyser including replacement of defective parts installed in Girls/Boys Hostels |
03/AC/EE/2018/203 |
123,734.00 |
25.09.2018
3.00 PM |
25.09.2018
3.30 PM |
Terms & Conditions |
List of Approved make Electrical |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 25.09.2018 upto 3.00 PM. |
|
Civil Work |
Creation of VVIP room by merging room no. 104, 105, 106 at VH |
28/C/D1/2018-19/04 |
1157976.00 |
15.10.2018
3.30 PM |
17.10.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 441 Type-IV |
28/C/D1/2018-19/03 |
1356186.00 |
15.10.2018
3.30 PM |
17.10.2018
3.30 PM |
|
|
Civil Work |
P/L vitrified tile flooring, wire mesh shutters on external side doors / windows and modular kitchen cabinet in kitchen of house no. 4006 |
28/C/D1/2018-19/02 |
648725.00 |
15.10.2018
3.30 PM |
17.10.2018
3.30 PM |
|
|
Civil Work |
Upgradation of house nos. 207 and 219 as per new norms |
28/C/D1/2018-19/01 |
542715.00 |
15.10.2018
3.30 PM |
17.10.2018
3.30 PM |
|
|
Electrical works |
Supply of the following material maintenance of south side residence and sport building |
IWD/ED/EE/301 |
0.00 |
26.09.2018
3.00 PM |
26.09.2018
3.30 PM |
Table of Contents |
Quotation Documents |
Make list |
BID |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 26.09.2018 upto 3.00 PM. |
|
Electrical works |
Replacement of damaged KHH meter installed at Hall-2, Hall-6 and Hall-11 as per enclosed complaints. |
IWD/ED/EE/300 |
51164.00 |
10.10.2018
3.00 PM |
10.10.2018
3.30 PM |
Table of Contents |
Quotation Documents |
Corrigendum |
Make list |
BID
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 26.09.2018 upto 3.00 PM. |
|
Empanelment for SANITATION Work |
Pre - Qualification Document For Empanelment of Sanitation Works |
IWD/CO/ 2018/558 dated 17.09.2018 |
0.00 |
08.10.2018 3.30 PM |
12.10.2018 3.30 PM |
|
|
Civil |
Carrying out minor Civil maintenance work in Academic area (Zone-I) |
15/Civil/D2/2018-19/01 |
55,46,143.00 |
24.09.2018
3.30 PM |
26.09.2018
3.30 PM |
|
|
Civil Work |
Day to day Maintenance of external water lines, sewer lines and cleaning of chocked drains and manholes i/c repairing of booster pumps , mini submersible pumps and diesel pumping sets and motor & pumps of swimming pool filter plant at IIT Kanpur |
27/C/D1/2018-19/01 |
6211715 |
03.10.2018
3.30 PM |
05.10.2018
3.30 PM |
|
|
Civil |
Construction of modular kitchen and providing and fixing of wiremesh door window shutter in house no. 3043. |
14/Civil/D2/2018-19/07 |
1,57,941.00 |
12.09.2018
3.30 PM |
14.09.2018
3.30 PM |
|
|
Civil |
Construction of modular kitchen in house no. 3002. |
14/Civil/D2/2018-19/06 |
1,50,915.00 |
12.09.2018
3.30 PM |
14.09.2018
3.30 PM |
|
|
Civil |
Construction of modular kitchen in house no. 306. |
14/Civil/D2/2018-19/05 |
1,53,268.00 |
12.09.2018
3.30 PM |
14.09.2018
3.30 PM |
|
|
Civil |
Construction of modular kitchen in house no. 4094 |
14/Civil/D2/2018-19/04 |
2,02,072.00 |
12.09.2018
3.30 PM |
14.09.2018
3.30 PM |
|
|
Civil |
Making shed encloser for heat exchanger at behind of SL-110 |
14/Civil/D2/2018-19/03 |
1,82,434.00 |
12.09.2018
3.30 PM |
14.09.2018
3.30 PM |
|
|
Civil |
Replacement of PVC floor, providing cupboard on wall offset, and distempering / painting in WL-213. |
14/Civil/D2/2018-19/02 |
1,58,098.00 |
12.09.2018
3.30 PM |
14.09.2018
3.30 PM |
|
|
Civil |
Aluminium glass partition in ground floor PDTF Lab. |
14/Civil/D2/2018-19/01 |
1,58,098.00 |
12.09.2018
3.30 PM |
14.09.2018
3.30 PM |
|
|
Civil Work |
Renovation of bathroom & kitchen of house no. 170-I, providing & fixing wire mesh shutter in external doors & windows in house no. 170-I & 1013-I, Providing & laying Vitrified tile in house no. 1001, 1032, 1051 & 1078-I and internal white washing & painting of house no. 1001, 1051, 1032 & 1078, Type-I |
26/C/D1/2018-19/01 |
599349.00 |
17.09.2018
3.30 PM |
19.09.2018
3.30 PM |
|
|
Civil Work |
Construction of underground RCC tank to store water from by passing of tube wells near STW No. 5 i/c necessary RCC pipe line |
26/C/D1/2018-19/02 |
1033533 |
17.09.2018
3.30 PM |
19.09.2018
3.30 PM |
|
|
Electrical works |
Replacement of defective ceiling fans & wall fans in ACES-306, Director office, ACES-413, Nl-I-312, Structure lab, WL-218, SL-116, FB-613, Biomaterial lab and light fitting in R-1 Lab at Academic area. |
IWD/ED/EE/248 |
0.00 |
14.09.2018
15.00 Noon |
14.09.2018
15.00 PM |
Table of Contents |
Quotation Documents |
Make list |
BID |
|
Electrical works |
Providing and making power and net points for newly purchased work station at central store and purchase. |
IWD/ED/EE/247 |
0.00 |
14.09.2018
15.00 Noon |
14.09.2018
15.00 PM |
Table of Contents |
Quotation Documents |
Make list |
BID |
|
Air Conditioing |
Installation of new hi wall split type AC's with associated works at Hydraulic Lab & DORA Office |
02/AC/EE/2018/186 |
125,367.00 |
14.09.2018
3.00 PM |
14.09.2018
3.30 PM |
Terms & Conditions |
List of Approved make AC |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 14.09.2018 upto 3.00 PM. |
|
Electrical |
P & F of spare feeder for integration of solar power plant with the existing electrical panel in campus school, KV, VH, old/New RA building, GH-I, GH Tower, hall-No. 2,3,7,8,9 & 11 at IIT Kanpur |
01/AC/EE/2018/181 |
106,025.00 |
04.10.2018
3.00 PM |
04.10.2018
3.30 PM |
Terms & Conditions |
List of Approved make AC |
BOQ |
Corrigendum |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 14.09.2018 upto 3.00 PM. |
|
Electrical |
Repairing of metal halide lights of mast at hockey and football ground |
57 /IWD/ED/286 |
330612/- |
12.09.2018 |
14.09.2018 |
NIT |
3.30 PM |
3.30 PM |
Contract Documents |
|
|
BOQ |
|
|
|
|
Electrical |
Providing power points, network points alongwith replacement of existing TL fittings with LED fittings in ACES-103 |
56 /IWD/ED/285 |
145370/-- |
12.09.2018 |
14.09.2018 |
NIT |
3.30 PM |
3.30 PM |
Contract Documents |
|
|
BOQ |
|
|
|
|
Electrical |
Providing power supply in the panel of AHU's & FCU's, exhaust fans, FFU's and inline fans in Animal House. |
55 /IWD/ED/284 |
260451/- |
12.09.2018 |
14.09.2018 |
NIT |
3.30 PM |
3.30 PM |
Contract Documents |
|
|
BOQ |
|
|
|
|
Empanelment for Civil Works |
Pre - Qualification Document For Empanelment of Civil Works |
IWD/CO/ 2018/538 dated: 05.09.2018 |
0.00 |
26.09.2018
3.30 PM
|
01.10.2018
3.30 PM |
|
|
Electrical |
Day to day Electrical maintenance work in Academic area. |
54/Elect/2018 |
1327920 |
14.09.2018
3.30 PM
|
19.09.2018
3.30 PM |
|
|
Electrical |
Providing power points and internet points alongwith other associated work in NL-II-204 & 305, WLE 112B, WLE-313, FB-R & D office (project Management cell). |
53 /IWD/ED/271 |
233536/- |
10.09.2018
3.30 PM
|
12.09.2018
3.30 PM |
|
|
Electrical |
Making separate feeder with supplying & laying cable from switch room FB (West) to 2nd floor & 3rd floor west side of lift at FB and providing & fixing cable tray with HDPE pipe, smoke detector and dismantling of light fittings / ceiling fans etc in L-7 at Lecture Hall Complex |
52 /IWD/ED/270 |
262175/- |
10.09.2018
3.30 PM
|
12.09.2018
3.30 PM |
|
|
Electrical |
Replacement of old CFL light fittings with LED fittings in corridor First & Second Floor at CESE Building |
51 /IWD/ED/269 |
142600/- |
10.09.2018
3.30 PM
|
12.09.2018
3.30 PM |
|
|
Electrical |
Replacement of damaged / unsafe pole fuse boxes and masonry pillars of street light poles on outside area of Hostel No. 5, 6,7,8,9,11 |
50 /IWD/ED/268 |
374098/- |
10.09.2018
3.30 PM
|
12.09.2018
3.30 PM |
|
|
Electrical |
Modification & renovation of electrical installation of all rooms at 4th floor of ACES Building. |
49 /IWD/ED/267 |
306503/ |
10.09.2018
3.30 PM
|
12.09.2018
3.30 PM |
|
|
Electrical |
Providing and making UPS power points and network points in smart city project building |
48 /IWD/ED/266 |
356331/- |
10.09.2018
3.30 PM
|
12.09.2018
3.30 PM |
|
|
Electrical |
Providing and Installation of 2x500 KVA DG set for proposed NSM data centre at IIT Kanpur. |
47/Elect/2018 |
6614955 |
18.09.2018
3.30 PM
|
25.09.2018
3.30 PM |
|
|
Civil Work |
White washing and painting of some rooms at hall-2,5,7,8,9,12 |
25/C/D1/2018-19/05 |
177498.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil Work |
Diversion of damaged sewer line at community centre Type-I |
25/C/D1/2018-19/04 |
224252.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil Work |
Creating of dressing room and renovation of toilet at Health centre |
25/C/D1/2018-19/03 |
416913.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil Work |
External repairing and painting of 2 blocks of Type II phase II houses [consisting of house nos. 297 to 2004 & 2005 to 2012] |
25/C/D1/2018-19/02 |
406388.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house nos. 220 and 2022 |
25/C/D1/2018-19/01 |
473076.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil Work |
P/L vitrified tile flooring, wire mesh shutters on external side doors / windows and modular kitchen cabinet in kitchen of house no. 440 |
24/C/D1/2018-19/03 |
585237.00 |
01.09.2018
3.30 PM |
05.09.2018
3.30 PM |
|
|
Civil Work |
Providing & fixing Reinforced Cement Concrete Grass Paver block for Car parking in front of control room building for Smart City Project & reconstruction of CC road in front & back side of control room building for Smart city Project |
24/C/D1/2018-19/02 |
548530.00 |
01.09.2018
3.30 PM |
05.09.2018
3.30 PM |
|
|
Civil Work |
Repairing and Painting of Hall-1 mess |
24/C/D1/2018-19/01 |
562431.00 |
01.09.2018
3.30 PM |
05.09.2018
3.30 PM |
|
|
Lift |
Supplying, installation, testing & commissioning of 8 passenger elevator at Western Lab Extension building IIT Kanpur |
46/Elect/2018 |
1,053,571.00 |
27.09.2018
3.30 PM
|
05.09.2018
3.30 PM |
|
|
Civil Work |
White washing and painting of 75 rooms at hall-8 |
23/C/D1/2018-19/01 |
245348.00 |
25.08.2018
3.30 PM |
28.08.2018
3.30 PM |
|
|
Civil Work |
Upkeeping of lawn tennis courts and gymkhana complex at IIT Kanpur |
22/C/D1/2018-19/03 |
2897148.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil Work |
Upkeeping of sports fields such as main athletics, cricket ground, hockey & football facility, ACES / athletics ground at IIT Kanpur |
22/C/D1/2018-19/02 |
3176718.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil Work |
Carrying out maintenance & minor civil works in residences and community buildings on south side of main drive (Part-II) |
22/C/D1/2018-19/01 |
6042281.00 |
08.09.2018
3.30 PM |
11.09.2018
3.30 PM |
|
|
Civil |
Tile flooring, replacement of cupboard shutter, replacement of lab sink / water line drainage line and painting in WL-116. |
13/Civil/D2/2018-19/6 |
18,99,976.00 |
23.08.2018
3.30 PM |
27.08.2018
3.30 PM |
|
|
Civil |
Construction of lift well adjoin to NET (ME Office) Building. |
13/Civil/D2/2018-19/5 |
8,37,452.00 |
23.08.2018
3.30 PM |
27.08.2018
3.30 PM |
|
|
Civil |
Civil work for new HPC room in CC and work for UPS / Battery / Panel room. |
13/Civil/D2/2018-19/4 |
11,57,186.00 |
23.08.2018
3.30 PM |
27.08.2018
3.30 PM |
|
|
Civil |
Setting right of house no. 4056 i/c water proofing treatment of terrace. |
13/Civil/D2/2018-19/3 |
12,09,852.00 |
23.08.2018
3.30 PM |
27.08.2018
3.30 PM |
|
|
Civil |
Dismantling the existing paver at car parking near NWTF and relaying for car parking and two wheeler parking near the Aerospace Building. |
13/Civil/D2/2018-19/2 |
5,13,968.00 |
23.08.2018
3.30 PM |
27.08.2018
3.30 PM |
|
|
Civil |
Reparing of water proofing treatment above the Terrace of Lab 14 & 16 at BSBE Building. |
13/Civil/D2/2018-19/1 |
9,13,083.00 |
23.08.2018
3.30 PM |
27.08.2018
3.30 PM |
|
|
Electrical |
Rewiring & modification of electrical installations in vacate H.No. 4096, 1069, 126 and providing casing in place of wood batten and making additional 15A/5A power outlet within revised norms in vacate H.No. 327, 329, 368. |
45 /IWD/ED/231 |
293,734.00 |
17.08.2018 3.30 PM
|
21.08.2018
3.30 PM |
|
|
Electrical |
Replacement of non functioning of old FL/PL light fittings with LED in corridor of all floors at Faculty Building. |
44 /IWD/ED/ 230 |
279,587.00 |
17.08.2018 3.30 PM
|
21.08.2018
3.30 PM |
|
|
Electrical |
Replacement of non functioning of old FL/PL light fittings with LED in corridor of L-8 to L-17 ) at LHC. |
43 /IWD/ED/ 229 |
143,660.00 |
17.08.2018 3.30 PM
|
21.08.2018
3.30 PM |
|
|
Electrical |
Providing DG supply for UPS 20 KVA from ACES to WL-211 i/c other associated work and 32 nos. AC points with MCB for new clean room at Western Lab. |
42 /IWD/ED/ 228 |
155,453.00 |
17.08.2018 3.30 PM
|
21.08.2018
3.30 PM |
|
|
Electrical |
Laying & fixing of cable for external power supply to incubation centre, office block and VRF system of AC at IITK outreach centre NOIDA. |
41 /IWD/ED/227 |
381,892.00 |
17.08.2018 3.30 PM
|
21.08.2018
3.30 PM |
|
|
Air Conditioing |
Low side air-conditioning works for augmentation of central ac plant by 400 TR located near IWD central office, IIT Kanpur. |
16/AC/2018/490 |
5,153,502.00 |
28.08.2018
3.30 PM |
04.09.2018
3.30 PM |
|
|
Electrical |
Electrical work for the Clean Room at NCFlexE IIT Kanpur. |
0/Elect/2018 |
5,752,192 |
28.08.2018
|
31.08.2018
3.30 PM |
|
|
Civil |
Providing Cylinder Storage Cabin at out side of Bio Materials Lab. |
12/Civil/D2/2018-19/03 |
2,31,336.00 |
14.08.2018
3.30 PM |
17.08.2018
3.30 PM |
|
|
Civil |
Renovation of room no. 214 at Ist floor of CESE Building. |
12/Civil/D2/2018-19/02 |
3,76,825.00 |
14.08.2018
3.30 PM |
17.08.2018
3.30 PM |
|
|
Civil |
Civil work for installation of boiler,steam accumulator and air receiver with 7.50 m X 3.0 m shed for NAF. |
12/Civil/D2/2018-19/01 |
2,86,050.00 |
14.08.2018
3.30 PM |
17.08.2018
3.30 PM |
|
|
Civil Work |
Construction of enclosure with chain link fencing for treating injured peacocks at mango orchard behind air strip |
21/C/D1/2018-19/04 |
153294.00/- |
17.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Civil Work |
P/F wire mesh shutters on external side doors / windows of house no. 223, 253, 2101 and 4008 |
21/C/D1/2018-19/03 |
316726.00/- |
17.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Civil Work |
Internal and external painting of Health Centre and fixing of aluminium sliding cupboard shutter |
21/C/D1/2018-19/02 |
483794.00/- |
17.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 191 Type-I, |
21/C/D1/2018-19/01 |
180670.00/- |
17.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Civil Work |
Internal white washing and repairing of hall-I |
20/C/D1/2018-19/03 |
2493186.00/- |
21.08.2018
3.30 PM |
24.08.2018
3.30 PM |
|
|
Civil Work |
White washing / painting and filling of expansion joints of GH-1 |
20/C/D1/2018-19/02 |
1876338.00/- |
21.08.2018
3.30 PM |
24.08.2018
3.30 PM |
|
|
Civil Work |
P/L vitrified tile flooring in entire house except toilet portion in H. No. 256, 2025, 2034 & 435 |
20/C/D1/2018-19/01 |
561623.00/- |
21.08.2018
3.30 PM |
24.08.2018
3.30 PM |
|
|
Civil Work |
Construction of enclosure with chain link fencing and shades for stray animals in the campus |
19/C/D1/2018-19/03 |
638185.00/- |
17.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Civil Work |
Renovation of ladies changing room, reception area at swimming pool |
19/C/D1/2018-19/02 |
506107.00/- |
17.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Civil Work |
Day-to-day civil maintenance of all Hall of Residences, Director's Residence, Health Centre, RA hostel, Visitor's Hostel, new VH Extension, New SAC and sports complex, new GH tower, new RA hostel and old RA hostel etc. |
19/C/D1/2018-19/01 |
6401626.00/- |
17.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Civil |
Renovation of Dr. Sudhanshu Singh Lab at Biomaterials Lab |
11/Civil/D2/2018-19/03 |
2,56,219.00 |
06.08.2018
3.30 PM |
08.08.2018
3.30 PM |
|
|
Civil |
Distempering / painting and PVC flooring in all rooms of 4th floor ACES Building. |
11/Civil/D2/2018-19/02 |
4,73,235.00 |
06.08.2018
3.30 PM |
08.08.2018
3.30 PM |
|
|
Civil |
Providing /fixing moulded and prefinished 100 mm X 12 mm size skirting on soft partition in Flexible Electronic Center. |
11/Civil/D2/2018-19/01 |
2,25,360.00 |
06.08.2018
3.30 PM |
08.08.2018
3.30 PM |
|
|
Electrical |
Supply and installation of one no. 1000 KVA transformer, capacitor panel, PLC based LT panel for providing power supply to upcoming load of new NSM data centre at Computer Centre |
33/Elect/2018 |
7,798,327.00/- |
10.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Electrical |
Renovation of electrical installation for new NSM facility at computer centre. |
32/Elect/2018 |
9,658,237.00/- |
10.08.2018
3.30 PM |
21.08.2018
3.30 PM |
|
|
Store items |
Providing and installation of automated pumping system for supplying water in the overhead tank of solar system i/c 1.0 HP monoblock pump og Kirloskar or equivalent make , float type sensor, necessary wiring, making all necessary connections etc, complete as per direction of Engineer-in-charge. |
IWD/Div-I/300 dated 25.07.2018 |
99,120.00/- |
02.08.2018
3.00 PM |
02.08.2018
3.30 PM |
Table of Content |
Terms & condition |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 02.08.2018 upto 3.00 PM. |
|
|
Electrical |
Supplying, installation, testing & commissioning of 8 passenger elevator at NET building IIT Kanpur |
39/Lift/2018 |
1,016,949.00/- |
02.08.2018
3.30 PM |
10.08.2018
3.30 PM |
|
|
Electrical |
Providing of street light poles along with proposed boundary wall and road from chandel gate to Pradhan gate (phase-C). |
38/Elect/2018 |
2,018,112.00/- |
02.08.2018
3.30 PM |
10.08.2018
3.30 PM |
|
|
Electrical |
Replacement of faulty 3200 A and 4000A, ACB's of PLC panel of computer centre at substation no. 4 |
37/Elect/2018 |
690,449.00/- |
02.08.2018
3.30 PM |
10.08.2018
3.30 PM |
|
|
Electrical |
Shifting of power cables from C/o pre engineered building by CPWD at old SAC. |
36/Elect/2018 |
566,485.00/- |
02.08.2018
3.30 PM |
10.08.2018
3.30 PM |
|
|
Electrical |
Replacement of old AMF panel of 1x320 kVA DG (Lecture Hall) and 1x250 kVA DG (Nano Science) sets at DG house no. 1 and other associated works |
35/Elect/2018 |
16,23,168.00/- |
02.08.2018
3.30 PM |
10.08.2018
3.30 PM |
|
|
Electrical |
Renovation & modification work at old RA of 19 rooms |
34/Elect/2018 |
1,683,452.00/- |
02.08.2018
3.30 PM |
10.08.2018
3.30 PM |
|
|
Civil Work |
Creating of parking with old available grass paver at hall-12 near main gate |
18/C/D1/2018-19/02 |
460388.00/- |
31.07.2018
3.30 PM |
02.08.2018
3.30 PM |
|
|
Civil Work |
Replacement of blind / broken looking mirror of Hall-7, 8, 11,12 |
18/C/D1/2018-19/01 |
206089.00/- |
31.07.2018
3.30 PM |
02.08.2018
3.30 PM |
|
|
Civil Work |
Construction of Building for the Opportunity school at IIT Kanpur (SH: Civil & Electrical Works). |
17/C/D1/2018-19/01 |
38628391.00 |
14.08.2018
9.30 PM |
17.08.2018
3.30 PM |
|
|
Vertical sliding board system |
Providing and installation of Vertical sliding board system for L-7 in LHC |
IWD/Div-II/2018/525 dated 20.07.2018 |
|
07.08.2018
12.30 PM
|
|
Terms & Conditions |
Bid |
Corrigendum |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
07.08.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Air Conditioing |
Construction of Cyber Security building.(SH :- Air conditioning Works) |
15/AC/2018/456 |
4,599,233.00 |
03.08.2018
3.30 PM |
08.08.2018
3.30 PM |
|
|
Civil |
Construction of modular kitchen in house no. 3064 i/c providing and fixing of wiremwsh door window shutter. |
10/Civil/D2/2018-19/07 |
1,91,274.00 |
25.07.2018
3.30 PM |
27.07.2018
3.30 PM |
|
|
Civil |
Laying of vitrified tiles floor instead of mosaic floor in house no. 4085. |
10/Civil/D2/2018-19/06 |
2,89,769.00 |
25.07.2018
3.30 PM |
27.07.2018
3.30 PM |
|
|
Civil |
Providing MS railing in terrace and construction of RCC stair case in house no. 633. |
10/Civil/D2/2018-19/05 |
2,89,769.00 |
25.07.2018
3.30 PM |
27.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3030. |
10/Civil/D2/2018-19/04 |
4,25,449.00 |
25.07.2018
3.30 PM |
27.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 358. |
10/Civil/D2/2018-19/03 |
4,82,808.00 |
25.07.2018
3.30 PM |
27.07.2018
3.30 PM |
|
|
Civil |
Providing brick wall partition and Alu. sliding door and painting at Godown of Central Store. |
10/Civil/D2/2018-19/02 |
1,72,626.00 |
25.07.2018
3.30 PM |
27.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3035. |
10/Civil/D2/2018-19/01 |
3,20,543.00 |
25.07.2018
3.30 PM |
27.07.2018
3.30 PM |
|
|
Civil |
Misc. civil work such as rectification of seepage problem from toilet of house no. 390, replacement of flush door shutter in house no. 4080, 641, 646, providing and fixing of wiremesh door shutter in house no. 332, 3002,303,646, annual repairing painting of house no. 4093 with servant quarter and garage, DRG room painting of house no. 606, stair case painting of house no 347, replacement of damage water storage tank in house no. 4084, 3004 and replacement of Indian type WC seat with EWC seat in house no. 315. |
09/Civil/D2/2018-19/01 |
4,76,778.00 |
23.07.2018
3.30 PM |
25.07.2018
3.30 PM |
|
|
Consultancy Services |
Expression of Interst (EoI) for appointment of consultant for Planning & Design, IIT Kanpur Signage and Establishing its Branding & Identity (IInd call) |
IWD/CO/2018-19/ 447 dt. 11.07.2018 |
00/- |
06.08.2018
1500 hrs |
06.08.2018
1530 hrs |
Table of Content |
Notice |
EoI Documents |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an Expression of Interest document which can be downloaded free of cost and duly filled documents only be submitted off line on or before 06.08.2018 upto 1500 hrs. |
|
|
Civil Work |
Construction of drain and CC road with chain link fencing along the boundary wall from Charkhi Gate to Chandel Gate at IIT Kanpur –Part-B |
16/C/D1/2018-19/02 |
29929403.00 |
31.07.2018
3.30 PM |
03.08.2018
3.30 PM |
|
|
Civil Work |
Construction of drain and CC road with chain link fencing along the boundary wall from Pradhan Gate to Charkhi Gate at IIT Kanpur –Part-A |
16/C/D1/2018-19/01 |
32718093.00 |
31.07.2018
3.30 PM |
03.08.2018
3.30 PM |
|
|
Civil |
Construction of overhead and underground tank for the Hydraulic Lab. |
08/Civil/D2/2018-19/01 |
78,06,726.00 |
09.07.2018
3.30 PM |
06.08.2018
3.30 PM |
|
|
Air Conditioing |
SITC of Air handling unit of 12000 CFM capacity and associated works at ACES vertical extension. |
14/AC/2018/429 |
1,904,159.00 |
18.07.2018
3.30 PM |
23.07.2018
3.30 PM |
|
|
Civil Work |
Drilling of two new Deep Tube Wells at IIT Kanpur |
15/C/D1/2018-19/01 |
6038550.00 |
30.07.2018
3.00 PM |
30.07.2018
5.00 PM |
|
|
Civil |
Setting right of vacant house no. 309. |
07/Civil/D2/2018-19/08 |
5,01,368.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 353. |
07/Civil/D2/2018-19/07 |
5,06,712.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 317. |
07/Civil/D2/2018-19/06 |
5,11,232.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 4057 with Servant quarter and Garage. |
07/Civil/D2/2018-19/05 |
12,94,377.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil |
Excavation of Geotech field lab plot and filling with good earth. |
07/Civil/D2/2018-19/04 |
9,23,428.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil |
Construction of transformer yard and making panel room in IWD store compound. |
07/Civil/D2/2018-19/03 |
16,05,625.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil |
Making basket ball, badminton and volleyball court in Hall-VI compound. |
07/Civil/D2/2018-19/02 |
9,69,198.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 304. |
07/Civil/D2/2018-19/01 |
5,11,151.00 |
16.07.2018
3.30 PM |
18.07.2018
3.30 PM |
|
|
Civil work |
Expression of Interst (EoI) for appointment of consultant for development of Strategy Plan- 2035 for Infrastructure of IIT Kanpur Campus |
IWD/CO/2018-19/193 dt. 16.04.2018 |
0.00/- |
10.05.2018
1500 hrs |
10.05.2018
1530 hrs |
|
|
Civil Work |
Construction of cycle path connecting the road in front of Hall 2 upto International Student Hostel |
14/C/D1/2018-19/01 |
1536845.00/- |
08.07.2018
3.30 PM |
10.07.2018
3.30 PM |
|
|
Civil |
Construction of modular kitchen in house no 4093. |
06/Civil/D2/2018-19/07 |
2,08,591.00/- |
02.07.2018
3.30 PM |
04.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3063. |
06/Civil/D2/2018-19/06 |
4,61,920.00/- |
02.07.2018
3.30 PM |
04.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3025. |
06/Civil/D2/2018-19/05 |
4,34,444.00/- |
02.07.2018
3.30 PM |
04.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 331. |
06/Civil/D2/2018-19/04 |
4,99,983.00/- |
02.07.2018
3.30 PM |
04.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3046. |
06/Civil/D2/2018-19/03 |
3,30,098.00/- |
02.07.2018
3.30 PM |
04.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 360. |
06/Civil/D2/2018-19/02 |
3,91,542.00/- |
02.07.2018
3.30 PM |
04.07.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3032. |
06/Civil/D2/2018-19/01 |
4,56,787.00/- |
02.07.2018
3.30 PM |
04.07.2018
3.30 PM |
|
|
Electrical |
Repairing and replacement of damaged street lights near charkhi gate, Academic area, Hall-7 and 9, Boundary wall as per enclosed complaints. |
27 /IWD/ED/ 143 |
355540.00/- |
26.06.2018
3.30 PM |
27.06.2018
3.30 PM |
|
|
Furniture work |
Fabrication, Supply and Installation of Furniture to furnish Single and Double occupancy rooms at International Students Housing Facilities Building, IIT Kanpur. |
IWD/CO/2018/412 |
4400000.00/- |
23.07.2018
12.00 Noon |
23.07.2018
3.30 PM |
|
|
Civil Work |
Carrying out minor maintenance works in water supply and sewage disposal unit |
13/C/D1/2018-19/03 |
3313935.00/- |
12.07.2018
3.30 PM |
15.07.2018
3.30 PM |
|
|
Civil Work |
Widening of Culvert, extension of footpath, Creating parking space and Diversion of C.C. Road near Health Center |
13/C/D1/2018-19/02 |
2515867.00/- |
12.07.2018
3.30 PM |
15.07.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 126 & 1069, Type-I |
13/C/D1/2018-19/01 |
534412.00/- |
12.07.2018
3.30 PM |
15.07.2018
3.30 PM |
|
|
Horticulture |
Supply of Plants at Institute Nursary, IIT Kanpur |
IWD/CO/396A dated 15.06.2018 |
00/- |
02.07.2018
12.30 PM |
02.07.2018
3.30 PM |
Table of Contents |
Terms & condition and Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 02.07.2018 upto 3.00 PM. |
|
|
Electrical |
Providing input and output connection for 3x60 KVA UPS along with other associate work in Flexible Electronics Building. |
26 /IWD/ED/127 |
3,30,430/- |
26.06.2018
3.30 PM |
28.06.2018
3.30 PM |
|
|
Store items |
Supply of Sanitary fittings at IWD store, IIT Kanpur |
IWD/Div-I/202 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Water supply fittings at IWD store, IIT Kanpur |
IWD/Div-I/201 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
Store items |
Supply of Water supply fittings at IWD store, IIT Kanpur |
IWD/Div-I/200 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Water supply fittings at IWD store, IIT Kanpur |
IWD/Div-I/199 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Sanitary fittings at IWD store, IIT Kanpur |
IWD/Div-I/198 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Sanitary fittings at IWD store, IIT Kanpur |
IWD/Div-I/197 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Hardware fittings at IWD store, IIT Kanpur |
IWD/Div-I/196 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Hardware fittings at IWD store, IIT Kanpur |
IWD/Div-I/195 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Hardware fittings at IWD store, IIT Kanpur |
IWD/Div-I/194 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Store items |
Supply of Hardware fittings at IWD store, IIT Kanpur |
IWD/Div-I/193 dated 14.06.2018 |
00/- |
11.07.2018
3.00 PM |
11.07.2018
3.30 PM |
Table of Content |
NIT |
Terms & Conditions |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 11.07.2018 upto 3.00 PM. |
|
|
<
Electrical |
Electrical repairing and maintenance work required in vacate house no. 3003, 3033, 161, 621, 4061, 323, 3026, 3028, 1084, 164, 349 to accommodate new allottee. |
25 /IWD/ED/117 |
1,71,408/- |
26.06.2018
3.30 PM |
28.06.2018
3.30 PM |
|
|
Electrical |
Providing external power supply to air-conditioning facility to smart city project building from substation no. 10. |
24/IWD/ED/116 |
3,72,588/- |
26.06.2018
3.30 PM |
28.06.2018
3.30 PM |
|
|
Electrical |
Shifting of street light poles and feeder pillar from the CPWD construction site of Engineering Core Lab. |
NIT No. 23/IWD/ED/115 |
3,19,046/- |
15.06.2018
3.30 PM |
22.06.2018
3.30 PM |
|
|
Civil Work |
Cleaning of Rain Water Harvesting pits situated at various places in the campus |
12/C/D1/2018-19/01 |
182550.00/- |
16.06.2018
3.30 PM |
19.06.2018
3.30 PM |
|
|
Civil Work |
Providing & laying vitrified tile in floor of house no. 1035, Providing & laying vitrified tile in entire house, floor in bathroom & basin area of house no. 1082, Providing & fixing wire mesh shutter on external doors & windows of house no.1004 & 148 including internal white washing & painting of house no. 1082, Type-I |
12/C/D1/2018-19/02 |
240328.00/- |
05.07.2018
3.30 PM |
19.06.2018
3.30 PM |
|
|
Civil work |
Supply of MS column pipes assembly of 100 mm dia of "C" class MS pipe of Jindal / TATA make only with proper welded MS heavy duty flanges at both ends of 3 mtr length each including all material, labour T&P all taxes etc complete and its cartage upto IWD store at IIT Kanpur |
IWD/Div-I/186 dated 06.06.2018 |
197,650.00/- |
18.06.2018
12.00 PM |
18.06.2018
12.30 PM |
Table of Contents |
Terms & condition |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 18.06.2018 upto 12.00 PM. |
|
|
Installation of Back drop & banner |
Supply and Installation of back drop & banner for convocation 2018. |
IWD/Div-II/ 2018/421 dated: 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Supply of tantage materials in air strip |
Providing and fixing tantage at air strip for the visitors to receive the Hon'ble President |
IWD/Div-II/2018/ 420 dated 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Supply of Tentage materials in out side Auditorium Hall. |
Providing and fixing canopy type structure at main and rear entrances |
IWD/Div-II/2018/ 419 dated: 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Barricading from Air strip to Auditorium main gate |
Providing and fixing barricading along the road from air strip to auditorium wherever shall be required. |
IWD/Div-II/2018/418 dated: 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Tentage Materials |
Supplying and fixing of Tentage materials at inside & outside of auditorium. |
IWD/Div-II/ 2018/417 dated 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Decoration and Lighting |
Providing and fixing decoration and lighting of trees along both side of the road from main gate to SAC crossing and auditorium to Visitors Hostel . |
IWD/Div-II/ 2018/416 dated 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Flower Decoration |
Providing and fixing flower decoration at various locations. |
IWD/Div-II/2018/415 dated 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Flower Decoration |
Providing and fixing flower decoration at various locations. |
IWD/Div-II/2018/415 dated 04.06.2018 |
00/- |
12.06.2018
12.30 PM |
12.06.2018
12.30 PM |
Table of Content |
Terms & Conditions |
BOQ |
NOTE: Please note that e-tender portal of IITK allows the tenderers to
view the tenders only, but this is an quotation and can be downloaded free
of cost and duly filled quotations only be submitted off line on or before
12.06.2018 at 12.30 PM at Executive Engineer, IWD, Div-II office, IITK. |
|
|
Civil Work |
Internal white washing of room A-207, B-106, 108, 203, 204, 205, 206, 208, C-102, 104, 108, 201, 203, 206, 208, at VH EXTENSION |
11/C/D1/2018-19/01 |
159432.00/- |
11.06.2018
3.30 PM |
13.06.2018
3.30 PM |
|
|
Electrical |
Renovation & modification work at old RA of 19 rooms.. |
22/Elect/2018 |
16,83,452/- |
15.06.2018
3.30 PM |
22.06.2018
3.30 PM |
|
|
Electrical |
Construction of second floor above central block at ACES building (SH: Electrical works). |
21/Elect/2018 |
11,73,349/- |
15.06.2018
3.30 PM |
22.06.2018
3.30 PM |
|
|
Electrical |
Construction of mezzanine floor in the area of MSE workshop, Material testing Lab and Mineral Processing Lab, (SH: Electrical Works). |
20/Elect/2018 |
8,95,725/- |
15.06.2018
3.30 PM |
22.06.2018
3.30 PM |
|
|
Electrical |
Modification, repairing of LT panels of 250 KVA DG set and 320 KVA DG set installed at DG H.No. 1 |
19/Elect/2018 |
6,55,007/- |
15.06.2018
3.30 PM |
22.06.2018
3.30 PM |
|
|
Civil |
Shampoo cleaning of Godrej chair and some minor repair of Godrej chair in Auditorium hall incompliance to Convocation 2018. |
05/Civil/D2/2018-19/01 |
218250.00 |
06.06.2018
3.30 PM |
08.06.2018
3.30 PM |
|
|
Civil |
Carrying out minor maintenance Civil work in residences north side of Main Drive. |
03/Civil/D2/2018-19/01 |
42,61,069.00 |
11.06.2018
3.30 PM |
13.06.2018
3.30 PM |
|
|
Civil Work |
Cleaning of over head tanks for Hall VI, XII,XIII, New core lab, new RA, Western Lab, Faculty Building, Faculty Apartment and underground tanks for M S Building, Hall X, XI, XII and Ganga Barrage Water at IIT Campus |
09/C/D1/2018-19/02 |
141110.00/- |
02.06.2018
3.30 PM |
05.06.2018
3.30 PM |
|
|
Civil Work |
White washing and painting of Ground floor 35 rooms and corridor at hall-11 |
10/C/D1/2018-19/02 |
283105.00/- |
09.06.2018
3.30 PM |
12.06.2018
3.30 PM |
|
|
Civil Work |
Construction of lay bys on both side of the road in front of Central School |
10/C/D1/2018-19/01 |
257269.00/- |
09.06.2018
3.30 PM |
12.06.2018
3.30 PM |
|
|
Air conditioning |
Day-to-day maintenance of domestic AC & refrigeration section works of Academic & Hostel area, VH, VFA & Health centre etc. |
10/AC/2018/269 |
2,080,798.00 |
12.06.2018
3.30 PM |
18.06.2018
3.30 PM |
|
|
Air conditioning |
Day-to-day maintenance of central air conditioning facility i.e. AHUs, FCUs, air washers, valves, actuators etc |
09/AC/2018/269 |
2,122,615.00 |
12.06.2018
3.30 PM |
18.06.2018
3.30 PM |
|
|
Electrical |
Renovation of Hall-IV "H" block (SH: - Electrical Works). |
08/AC/2018/269 |
1,471,376.00 |
12.06.2018
3.30 PM |
18.06.2018
3.30 PM |
|
|
Civil work |
Supply of earthern flower pots size 10 inch at Institute Nursary, IIT Kanpur |
IWD/CO/275 dated 29.05.2018 |
|
19.06.2018
1500 hrs |
19.06.2018
1530 hrs |
Table of Contents |
Terms & condition and Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 19.06.2018 upto 3.00 PM.. |
|
|
Civil work |
Supply of cow dung manure at Institute Nursary, IIT Kanpur |
IWD/CO/274 dated 29.05.2018 |
|
19.06.2018
1500 hrs |
19.06.2018
1530 hrs |
Table of Contents |
Terms & condition and Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 19.06.2018 upto 3.00 PM.. |
|
|
Civil |
Renovation of Lab no 305 at Northen Lab-II. |
04/Civil/D2/2018-19/02 |
251,874.00 |
01.06.2018
3.30 PM |
04.06.2018
3.30 PM |
|
|
Civil |
Carrying out miscellaneous civil work such as painting, white washing of green room, toilet lobby of community hall building incompliance to convocation 2018. |
04/Civil/D2/2018-19/01 |
469,585.00 |
01.06.2018
3.30 PM |
04.06.2018
3.30 PM |
|
|
Electrical |
Rewiring & modification of electrical installations in vacate H.No. 4096, 1069, 126 and providing casing in place of wood batten and making additional 15A/5A power outlet within revised norms in vacate H.No. 327, 329, 368. |
18/IWD/ED/87 |
2,93,734/- |
04.06.2018
3.30 PM |
06.06.2018
3.30 PM |
|
|
Electrical |
Providing GI plate earthing & power points with network points i/c other associated works in Bio Material Lab . |
17/IWD/ED/86 |
1,77,613/- |
04.06.2018
3.30 PM |
06.06.2018
3.30 PM |
|
|
Electrical |
Repairing / Renovation of electrical installation at Director Bunglow. |
16/IWD/ED/85 |
2,78,850/- |
04.06.2018
3.30 PM |
06.06.2018
3.30 PM |
|
|
Electrical |
Providing main power supply and DG power supply to proposed AC plant (1 x 400 TR) near IWD IIT Kanpur |
11/Elect./2018 |
1,04,09,209/- |
04.06.2018
3.30 PM |
13.06.2018
3.30 PM |
|
|
Civil Work |
Cleaning of over head tanks for Hall VI, XII,XIII, New core lab, new RA, Western Lab, Faculty Building, Faculty Apartment and underground tanks for M S Building, Hall X, XI, XII and Ganga Barrage Water at IIT Campus |
09/C/D1/2018-19/02 |
141110.00/- |
02.06.2018
3.30 PM |
05.06.2018
3.30 PM |
|
|
Civil Work |
Replacement of rusted frofile window and repairing of tiles / kota at hall-8 mess kitchen |
09/C/D1/2018-19/01 |
337197.00/- |
02.06.2018
3.30 PM |
05.06.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 166 & 177, Type-I |
08/C/D1/2017-18/01 |
282296.00/- |
26.05.2018
3.30 PM |
29.05.2018
3.30 PM |
|
|
Civil Work |
Transporting, spreading and compacting available earth in embankment of road from new Gumti no. 15 to Airstrip and painting of road marking strips at place of new road and parking of Academic area. |
07/C/D1/2018-19/01 |
473244.00/- |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3038. |
02/Civil/D2/2018-19/08 |
4,31,211.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3020. |
02/Civil/D2/2018-19/07 |
4,11,676.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 387. |
02/Civil/D2/2018-19/06 |
3,00,302.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 342. |
02/Civil/D2/2018-19/05 |
4,12,921.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
Renovation for creation of male and female toilet in Engineering Metallurgy Lab (TA-201) |
02/Civil/D2/2018-19/04 |
2,32,404.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
Renovation of Core Lab -205 D for Creation of research space. |
02/Civil/D2/2018-19/03 |
3,89,635.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
Distempering / painting and PVC flooring in all rooms of 4th floor ACES Building. |
02/Civil/D2/2018-19/02 |
4,54,306.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Civil |
(a)-Providing cycle stand frames in parking area of Block C & D of hall-6, (b)- Construction of rooms (Size 2.0 m X 2.0 m) for air compressor in Hall-6 |
02/Civil/D2/2018-19/01 |
(a)-4,04,922.00 (b)-69,416.00 Total-4,74,338.00 |
23.05.2018
3.30 PM |
25.05.2018
3.30 PM |
|
|
Electrical |
Supplying, installation, testing & commissioning of 8 passenger elevator at Western Lab Extension building IIT Kanpur. |
15/Lift/2018 |
1,053,571.00 |
25.05.2018
3.30 PM |
31.05.2018
3.30 PM |
|
|
Electrical |
Zonal contract for petty electrical works of academic area Zone-III (Phase-I). |
14/Elect./2018 |
2,463,907.00 |
25.05.2018
3.30 PM |
31.05.2018
3.30 PM |
|
|
Electrical |
Replacement of defective and damaged circuit breaker assembly unit for 11 KV SF 6 breakers and retrofitting the existing air circuit breakers. |
13/Elect./2018 |
25,02,757/- |
25.05.2018
3.30 PM |
31.05.2018
3.30 PM |
|
|
Electrical |
Rewiring & modification of electrical installations in vacate H.No. 343, 3016, 4072, 618, 629 and providing casing and capping in place of wood batten and making additional 15A/5A power outlets points within revised norms in vacate H.No. 624, 625, 310, 377, 317,180. |
12/Elect./2018 |
6,91,563/- |
25.05.2018
3.30 PM |
31.05.2018
3.30 PM |
|
|
Civil Work |
Construction of 1 No. Basketball, 2 Nos. Badminton and 1 No. Volleyball courts at Hall of Residence for Boys No. 13 |
06/C/D1/2018-19/02 |
1656042.00/- |
30.05.2018
3.30 PM |
01.06.2018
3.30 PM |
|
|
Civil Work |
Internal repairing, white washing, distempering and painting of Kendriya Vidyalaya at I.I.T.Kanpur (with revised specifications) |
06/C/D1/2018-19/01 |
1798960.00/- |
30.05.2018
3.30 PM |
01.06.2018
3.30 PM |
|
|
Electrical |
Different electrical works in CESE-119, NL-II-305, CL-102C, ACES-116, CL-107B, WL-111, FB -301, WL-116, SL-206, NCL-204, 206 & 207, FB-388 JEE/Gate Building, Nuclear Lab, WLE-314 and CESE-102. |
10 /IWD/ ED/50 |
283,850.00/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Electrical maintenance work at vacated H. No. 214, 222, 251, 270, 280, 284, 285, 288, 291, 2002, 2003, 2006, 2010 and 2026 in south side residences. |
09 /IWD/ ED/49 |
1,43,342/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Replacement of old and damaged light fitting with new LED luminaries at football ground and badminton court in OLD RA Hostel. |
08 /IWD/ED/ 44 |
2,61,691/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Replacement of electrical installation in SL-301, SL-305 and CL-205D |
07 /IWD/ED/43 |
4,96,826/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Annual maintenance contract for fire alarm system in various building. |
06/IWD/ED/42 |
4,22,832/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Providing plug points and internet points for 30 computers & 4 AC in language lab at kendriya Vidyalaya. |
05 /IWD/ED/41 |
2,22,203/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Different electrical works in BSBE lab-14, library, WL-207, IME-301, CESE-220 and Account Section. |
04 /IWD/ ED/40 |
1,85,900/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Providing power points, internet points and light fittings in Nl-I-203 & roof top at NL-I (newly constructed) |
03 /IWD/ED/ 39 |
3,02,816/- |
14.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Providing internet points, GI poles and street light fittings and related electrical works at various places in the campus for fixing of 250 no's CCTV cameras as requested by Security Section. |
01/Elect/2018 |
5,790,870.00/- |
23.05.2018
3.30 PM |
30.05.2018
3.30 PM |
|
|
Civil Work |
P/F wire mesh shutters on external side doors / windows and P/F modular kitchen cabinet in the Kitchen of house no. 4005 |
05/C/D1/2018-19/02 |
442951.00/- |
19.05.2018
3.30 PM |
22.05.2018
3.30 PM |
|
|
Civil Work |
Internal and external painting of Kislaya School at I.I.T.Kanpur |
05/C/D1/2018-19/01 |
140105.00/- |
19.05.2018
3.30 PM |
22.05.2018
3.30 PM |
|
|
Civil work |
Supply of 2500 bags of PPC Cement at IWD Store IIT Kanpur |
IWD/Div-I/77 dt. 08.05.2018 |
750,000.00/- |
18.05.2018
1500 hrs |
18.05.2018
1530 hrs |
Table of Contents |
NIT |
Terms & condition |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 18.05.2018 upto 12.00 PM. |
|
|
Electrical |
Providing and fixing of variable refrigerant flow (VRF) type units at Smart City Control room. |
07/AC/2018/214 |
1,113,889.00/- |
11.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Supply, installation, testing & commissioning of cold room at Hall-VIII mess. |
06/AC/2018/214 |
648,460.00/- |
11.05.2018
3.30 PM |
16.05.2018
3.30 PM |
|
|
Electrical |
Laying UTP cable and fixing internet boxes for Wi-fi. Connections at Hall-VIII & IX. |
05/AC/2018/181 |
829,812.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Air conditioning |
Annual operation contract of AC plant 2 x 25 TR capacity, AHU's Low side HVAC and BMS system of Advance Imaging Centre at Microscope Building |
04/AC/2018/181 |
843,080.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Air conditioning |
Day-to-day operation works of central AC plants facility inside the academic area |
03/AC/2018/181 |
2,022,424.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Civil Work |
Internal white washing/ painting and repairing of hall-X |
04/C/D1/2018-19/02 |
4134172.00/- |
30.05.2018
3.30 PM |
01.06.2018
3.30 PM |
|
|
Civil Work |
Renovation of old RA hostel (Room no 111 to 120 & 211 to 220 with floor tiles in corridor floor, room floor, one no Guest room, F. F. 2nos big hall, Two nos. stair case) |
04/C/D1/2018-19/01 |
6571595.00/- |
30.05.2018
3.30 PM |
01.06.2018
3.30 PM |
|
|
Civil |
Developing parking space and painting on compound wall of Hall VI (G.H Tower) |
01/Civil/D2/2018-19/08 |
7,62,406.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 624 with Servant Quarter and Garage. |
01/Civil/D2/2018-19/07 |
9,88,741.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 320. |
01/Civil/D2/2018-19/06 |
5,11,466.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 311. |
01/Civil/D2/2018-19/05 |
5,11,466.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 4095 with Servant Quarter and Garage. |
01/Civil/D2/2018-19/04 |
6,94,656.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil |
Construction of lift well adjoin to WLEx Building. |
01/Civil/D2/2018-19/03 |
7,52,340.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil |
Making partition wall with door and Tile flooring on IInd floor in common area above the mess of Hall-6 |
01/Civil/D2/2018-19/02 |
16,68,486.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil |
Construction of shed encloser for compressor and hammer mill in front of workshop. |
01/Civil/D2/2018-19/01 |
5,33,405.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Civil Work |
P/L vitrified flooring in entire house except both toilets, P/F wire mesh shutters on the external sides of doors/windows and modular kitchen of house no 449 |
03/C/D1/2018-19/01 |
648789.00/- |
16.05.2018
3.30 PM |
18.05.2018
3.30 PM |
|
|
Consultancy Services |
Expression of Interst (EoI) for appointment of consultant for Planning & Design, IIT Kanpur Signage and Establishing its Branding & Identity |
IWD/CO/2018-19/ 217 dt. 02.05.2018 |
0.00/- |
25.05.2018
1500 hrs |
25.05.2018
1530 hrs |
Table of Contents |
NIT |
EoI Documents |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an Expression of Interest document which can be downloaded free of cost and duly filled documents only be submitted off line on or before 25.05.2018 upto 1500 hrs. |
|
|
Civil Work |
Transporting, spreading and compacting available earth in embankment of road from new Gumti no. 15 to Airstrip and painting of road marking strips at place of new road and parking of Academic area. |
02/C/D1/2018-19/01 |
473244.00/- |
09.05.2018
3.30 PM |
11.05.2018
3.30 PM |
|
|
Civil Work |
P/L vitrified tile flooring in entire house except toilets in house no. 450 |
01/C/D1/2018-19/01 |
179127.00/- |
09.05.2018
3.30 PM |
11.05.2018
3.30 PM |
|
|
Civil work |
Providing and fixing of signages in Hall of residence-XII |
IWD/Div-I/38 dated 24.04.18 |
150,900.00/- |
04.05.2018
12.00 PM |
04.05.2018
12.30 PM |
Table of Contents |
NIT |
Terms & condition |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 04.05.2018 upto 12.00 PM. |
|
|
Civil work |
Supply of 2500 bags of PPC Cement at IWD Store IIT Kanpur |
IWD/Div-I/21 dt. 12.04.2018 |
750,000.00/- |
25.04.2018
5.00 PM |
25.04.2018
3.30 PM |
Table of Contents |
NIT |
Terms & condition |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off line on or before 25.04.2018 upto 12.00 PM. |
|
|
Air conditioning |
Construction of Office Block at IIT Kanpur Outreach Centre NOIDA (SH: Air-conditioning Works). |
46/AC/2018/161 |
9637745.00/- |
26.04.2018
3.30 PM |
03.05.2018
3.30 PM |
|
|
Air conditioning |
Supply, laying, testing & commissioning of chilled water grid pipeline from computer centre to western lab via old core lab & ACES. (Phase-II). |
45/AC/2018/161 |
9544580.00/- |
26.04.2018
3.30 PM |
03.05.2018
3.30 PM |
|
|
Civil Work |
Providing and fixing polycarbonate sheet shed in front of canteen at Hall-8 |
37/C/D1/2017-18/02 |
788827.00/- |
18.04.2018
3.30 PM |
20.04.2018
3.30 PM |
|
|
Civil Work |
Renovation of old RA hostel (Room no 101 to 110 & 201 to 210 with floor tiles in corridor, room floor, one no Guest room, GF big hall, office, one staircase, and 3 nos. common toilet) |
37/C/D1/2017-18/01 |
6381175.00/- |
18.04.2018
3.30 PM |
20.04.2018
3.30 PM |
|
|
Civil |
Civil work for construction of mezzanine floor and renovation in MSE workshop. |
29/Civil/D2/2017-18/01 |
42,23,935.00/- |
11.04.2018
3.30 PM |
13.04.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 327. |
28/Civil/D2/2017-18/03 |
4,74,257.00/- |
02.04.2018
3.30 PM |
04.04.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 377. |
28/Civil/D2/2017-18/02 |
4,57,860.00/- |
02.04.2018
3.30 PM |
04.04.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 379. |
28/Civil/D2/2017-18/01 |
4,20,227.00/- |
02.04.2018
3.30 PM |
04.04.2018
3.30 PM |
|
|
Civil Work |
Repairing and painting of old mess at GH-Tower |
36/C/D1/2017-18/04 |
120831.00/- |
31.03.2018
3.30 PM |
03.04.2018
3.30 PM |
|
|
Civil Work |
Renovation of house No. 180, Type-I |
36/C/D1/2017-18/03 |
281739.00/- |
31.03.2018
3.30 PM |
03.04.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house nos. 251 and 284 |
36/C/D1/2017-18/02 |
446723.00/- |
31.03.2018
3.30 PM |
03.04.2018
3.30 PM |
|
|
Civil Work |
P/F wire mesh shutter on external door/window of H. Nos. 214,230 & 2067, P/L vitrified tile flooring in entire house except toilet portion in H. Nos. 214 & 230 and renovation of WC, bath & kitchen of house no. 214 |
36/C/D1/2017-18/01 |
494480.00/- |
31.03.2018
3.30 PM |
03.04.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house nos. 270 and 2002 |
35/C/D1/2017-18/03 |
502922.00/- |
31.03.2018
3.30 PM |
03.04.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 451 |
35/C/D1/2017-18/02 |
746782.00/- |
31.03.2018
3.30 PM |
03.04.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 123, 146, 1017 & 1020 Type-I |
35/C/D1/2017-18/01 |
577881.00/- |
31.03.2018
3.30 PM |
03.04.2018
3.30 PM |
|
|
Civil Work |
Recasting of damaged R.C.C. Slab and setting right of vacant house n. 1070, Type-I |
34/C/D1/2017-18/04 |
460936.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Civil Work |
Renovation of bathroom and internal white washing & painting of house no. O-3, S-2, U-4, V-2 & V-5, SBRA |
34/C/D1/2017-18/03 |
450644.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Civil Work |
Repairing of broken wall / floor tiles and replacement of M.S chamber grating at hall-11 mess |
34/C/D1/2017-18/02 |
283653.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Civil Work |
Providing and fixing dustbin stand at All boys and girls hostel near mess,Type-1 in two places, marriage lawn in one place, community centre type-II, W, Z block near SBRA |
34/C/D1/2017-18/01 |
143442.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 283 and 285Setting right of vacant house no. 1000, 1030 and 1034 Type-I |
33/C/D1/2017-18/04 |
667456.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 283 and 285 |
33/C/D1/2017-18/03 |
555007.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 280 and 288 |
33/C/D1/2017-18/02 |
537163.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Civil Work |
Providing & laying cement concrete in cycle path in place of grass paver at GH-I |
33/C/D1/2017-18/01 |
526738.00/- |
26.03.2018
3.30 PM |
28.03.2018
3.30 PM |
|
|
Electrical |
Rejuvenation of electrical works in visitor hostel lounge |
43/AC/2018/416 |
478,876.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Electrical |
Re-insulation work in conference room, ground floor corridor & AHU room at IME building |
42/AC/2018/415 |
162,114.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Electrical |
Supply, installation, testing & commissioning of AHU, piping, ducting etc in room no. SL-301. |
40/AC/2018/413 |
499,392.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Electrical |
Providing & fixing of light fixtures, associated wiring, power distribution and power supply cable for chowpatty (proposed) behind hall-8 |
39/Electrical/2018/107 |
62,7427.00/- |
20.03.2018
3.30 PM |
26.03.2018
3.30 PM |
|
|
Civil Work |
Supply of 2500 bags of PPC Cement at IWD Store IIT Kanpur |
IWD/CO/2017-18/ 118 dated 09.03.2018 |
75,0000.00/- |
24.03.2018
10.00 PM |
26.03.2018
12.30 PM |
|
|
Civil |
Setting right of vacant house no. 365. |
27/Civil/D2/2017-18/05 |
4,30,668.00/- |
19.03.2018
3.30 PM |
21.03.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3017 |
27/Civil/D2/2017-18/04 |
4,19,798.00/- |
19.03.2018
3.30 PM |
21.03.2018
3.30 PM |
|
|
Civil |
Relaying of damaged floor with vitrified tiles floor in house no. 4092 i/c annual repairing painting white washing of house no. 4092. |
27/Civil/D2/2017-18/03 |
4,62,516.00/- |
19.03.2018
3.30 PM |
21.03.2018
3.30 PM |
|
|
Civil |
Repairing and painting in 3rd floor Library Building. |
27/Civil/D2/2017-18/02 |
4,77,077.00/- |
19.03.2018
3.30 PM |
21.03.2018
3.30 PM |
|
|
Civil |
Civil work for renovation of SL-301 (Office Space) and SL-305 (Lab Space). |
27/Civil/D2/2017-18/01 |
4,16,162.00/- |
19.03.2018
3.30 PM |
21.03.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3009. |
26/Civil/D2/2017-18/03 |
5,19,885.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Civil |
Repairing of water proofing work part portion at terrace of IME Building. |
26/Civil/D2/2017-18/02 |
5,98,466.00/- |
14.03.2018
3.30 PM |
16.03.2018
3.30 PM |
|
|
Civil |
Construction of workshop for NWTF at back side of NWTF Building. |
26/Civil/D2/2017-18/01 |
15,64,561.00/- |
20.03.2018
3.30 PM |
01.03.2018
3.30 PM |
|
|
Civil Work |
Replacement of door and blind looking mirror of Toilet / bath room at hall-7 |
32/C/D1/2017-18/05 |
285876.00/- |
07.03.2018
3.30 PM |
09.03.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house nos. 2006 and 2010 |
32/C/D1/2017-18/04 |
434335.00/- |
07.03.2018
3.30 PM |
09.03.2018
3.30 PM |
|
|
Civil Work |
Providing & fixing vitrified tile in floor of house no. 1041 , 193 & 1066-I, Providing & fixing wire mesh shutter on external door & window of house no. 1041, 127, 105-I, making an opening in inner lobby for fixing window in house no. 1041 & 193-I i/c internal white washing & painting of house no. 1041, 193, 127 & 1066 Type-I |
32/C/D1/2017-18/03 |
418178.00/- |
07.03.2018
3.30 PM |
09.03.2018
3.30 PM |
|
|
Civil Work |
Recasting of damaged R.C.C Slab & setting right of vacant house no. 1072, Type-I |
32/C/D1/2017-18/02 |
324735.00/- |
07.03.2018
3.30 PM |
09.03.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 166 & 177, Type-I |
32/C/D1/2017-18/01 |
282296.00/- |
07.03.2018
3.30 PM |
09.03.2018
3.30 PM |
|
|
ELECTRICAL |
Replacement of damaged 400W MH lights (08 nos.) with 240W LED flood light at tennis ground as enclosed requisition. |
83/IWD/ED/535 |
232,124.00/- |
05.03.2018
3.30 PM |
07.03.2018
3.30 PM |
|
|
ELECTRICAL |
Different electrical works at SCDT, water tunnel facility (Boiler Room), SL 209C, SL 110B, FB 337, SL 108B, FEC Building, Corridor near old IME and SL 213. |
82/IWD/ED/534 |
209,885.00/- |
05.03.2018
3.30 PM |
07.03.2018
3.30 PM |
|
|
ELECTRICAL |
Providing & laying cable for DG supply from DG House No.1 to WL-221 & 314. |
81/IWD/ED/533 |
282,774.00/- |
05.03.2018
3.30 PM |
07.03.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 2003 and 2026 |
31/C/D1/2017-18/01 |
577928.00/- |
07.03.2018
3.30 PM |
09.03.2018
3.30 PM |
|
|
Civil Work |
Renovation of toilet & kitchen of H. No. 2065, 2075, 2082, 2093 and P/L vitrified tile flooring & P/F wire mesh shutters on external side doors / windows in H. No. 292 |
31/C/D1/2017-18/02 |
585907.00/- |
07.03.2018
3.30 PM |
09.03.2018
3.30 PM |
|
|
Civil |
Renovation of room no. 401 at 3rd floor of IME Building. |
25/Civil/D2/2017-18/07 |
8,71,786.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 4097 with Servant Quarter and Garage . |
25/Civil/D2/2017-18/06 |
7,52,842.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 625 with Servant Quarter and Garage . |
25/Civil/D2/2017-18/05 |
9,27,803.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 4072 with Servant Quarter and Garage . |
25/Civil/D2/2017-18/04 |
10,07,904.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 4096 with Servant Quarter and Garage . |
25/Civil/D2/2017-18/03 |
9,75,021.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 618 with Servant Quarter and Garage . |
25/Civil/D2/2017-18/02 |
12,89,896.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 629 with Servant Quarter and Garage . |
25/Civil/D2/2017-18/01 |
12,70,636.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil |
Making shed for compressor at behind of Geotech Lab (W.L.Ex). |
24/Civil/D2/2017-18/06 |
1,24,357.00/- |
19.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Civil |
Providing / Laying Crazy tiles on roof of Geotech field test Building. |
24/Civil/D2/2017-18/05 |
1,88,624.00/- |
19.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Civil |
Providing of Lab facility at IInd floor near class room of NWTF Building. |
24/Civil/D2/2017-18/04 |
3,71,366.00/- |
19.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Civil |
P.V.C sheet flooring & distempering and painting in WL Ex-212. |
24/Civil/D2/2017-18/03 |
1,21,538.00/- |
19.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Civil |
Construction of modular kitchen in house no. 651. |
24/Civil/D2/2017-18/02 |
1,64,635.00/- |
19.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 344. |
24/Civil/D2/2017-18/01 |
4,81,105.00/- |
19.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
ELECTRICAL |
Annual maintenance contract for fire alarm system in CESE, Advance Imagine Centre, Helicopter Building, NWTF, new Core Lab, SIDBI, Outreach Building, Media Asia Lab, SBRA all block, Faculty Apartment, RA Tower and new SAC. |
80/IWD/ED/509 |
406,031.00/- |
13.02.2018
3.30 PM |
16.02.2018
3.30 PM |
|
|
Civil work |
Empanelment of Advertising Agencies for release of advertisements in the News Papers for publication of tenders of IWD, Indian Institute of Technology Kanpur - 208016 |
IWD/CO/2017-18/713 dated 07.02.2018 |
0.00/- |
26.02.2018
5.00 PM |
28.02.2018
3.30 PM |
Table of Contents |
NIT |
NIT and TD |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an tender can be downloaded free of cost and duly filled tender only be submitted off line on or before 26.02.2018 upto 5.00 PM.. |
|
|
Civil Work |
Carrying out maintenance & minor civil works in residences and community buildings on south side of main drive (Part-I) |
30/C/D1/2017-18/01 |
5,601,343.00/- |
06.03.2018
3.30 PM |
08.03.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 192 & 1022 Type-I |
29/C/D1/2017-18/03 |
533,438.00/- |
26.03.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 463 |
29/C/D1/2017-18/02 |
1,401,125.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Civil Work |
Construction of new toilet block H both side after demolishing of existing toilet block i/c repairing of damaged structure and modification of railing at Hall-IV |
29/C/D1/2017-18/01 |
4,111,954.00/- |
26.02.2018
3.30 PM |
28.02.2018
3.30 PM |
|
|
Electrical |
Providing & fixing of LED lights in corridors, washroom and mess area at Hall-No. 1,2,3,4 & 5. |
38/Electrical/2018 |
3,180,960.00/- |
16.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Electrical |
Annual zonal rate contract for petty electrical zonal works of hostel area. (Zone-I) |
37/Electrical/2018 |
2,674,720.00/- |
16.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Air conditioning |
SITC of double skin AHUs, TFAs, VAVs, GSS/GI ducting, CHW piping and associated works at vertical extension of BSBE building |
36/AC/2018 |
3,033,981.00/- |
16.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Air conditioning |
Day-to-day operation & maintenance works of small AC plants facility & buildings inside the academic area i.e. IME AC plant, CESE AC plant & Nano AC Plant etc. |
35/AC/2018 |
2,022,424.00/- |
16.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Air conditioning |
Day-to-day maintenance of domestic AC & refrigeration section works of Academic & Hostel area, VH, VFA & Health centre etc. |
34/AC/2018 |
2,080,798.00/- |
16.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Air conditioning |
Day-to-day maintenance of central air conditioning facility i.e. AHUs, FCUs, air washers, valves, actuators etc.. |
33/AC/2018 |
2,122,615.00/- |
16.02.2018
3.30 PM |
21.02.2018
3.30 PM |
|
|
Civil Work |
Setting right of vacant house no. 213, 222 and 291 |
28/C/D1/2017-18/05 |
919229.00/- |
26.03.2018
3.30 PM |
22.02.2018
3.30 PM |
|
|
Civil Work |
Misc minor maintenance works in house no. 210, 2001, 2007, 2059 and 416 |
28/C/D1/2017-18/04 |
506753.00/- |
26.03.2018
3.30 PM |
22.02.2018
3.30 PM |
|
|
Civil Work |
Construction of 2 nos. tin shed for parking the fire tenders near the existing room for student activity near security section |
28/C/D1/2017-18/03 |
789055.00/- |
20.02.2018
3.30 PM |
22.02.2018
3.30 PM |
|
|
Civil Work |
Providing and fixing shed for ambulance in the connecting corridor at health centre |
28/C/D1/2017-18/02 |
618874.00/- |
20.02.2018
3.30 PM |
22.02.2018
3.30 PM |
|
|
Civil Work |
Renovation of VH Lounge |
28/C/D1/2017-18/01 |
1098326.00/- |
20.02.2018
3.30 PM |
22.02.2018
3.30 PM |
|
|
ELECTRICAL |
Renovation of electrical installation for new lab setup in NL II 307. |
79/IWD/ED/490 |
325,395.00/- |
31.01.2018
3.30 PM |
02.02.2018
3.30 PM |
|
|
ELECTRICAL |
Repairing and replacement of defective and damaged cable, MCCB etc at booster pump and Community Center Type-II, Hall-5 etc and associated works. |
78/IWD/ED/489 |
373,153.00/- |
31.01.2018
3.30 PM |
02.02.2018
3.30 PM |
|
|
ELECTRICAL |
Replacement of existing 8 no's swimming pool light with 210W LED light and existing 70W sodium vapor garden light with 40W LED postop lantern fitting as per enclosed requisition. |
77/IWD/ED/488 |
422,686.00/- |
31.01.2018
3.30 PM |
02.02.2018
3.30 PM |
|
|
ELECTRICAL |
Providing internet points, GI poles and street light fittings and related electrical works at various places in the campus for fixing of 250 no's CCTV cameras as requested by Security Section. |
76/Elect./2018 |
5,790,870.00/- |
08.02.2018
3.30 PM |
19.02.2018
3.30 PM |
|
|
ELECTRICAL |
Annual Maintenance contract for 11/0.433 kV Substations of Academic Area. (SS-1,4,7&9) |
75/Elect./2018 |
1,435,397.00/- |
08.02.2018
3.30 PM |
19.02.2018
3.30 PM |
|
|
ELECTRICAL |
Zonal contract for street lights and sports facility lights and other associated works (Zone-VI). |
74/Elect./2018 |
1,772,043.00/- |
08.02.2018
3.30 PM |
19.02.2018
3.30 PM |
|
|
ELECTRICAL |
Zonal contract for petty electrical works of substations, underground distribution system and feeder pillars etc. (Zone-V) |
73/Elect./2018 |
1,976,638.00/- |
08.02.2018
3.30 PM |
19.02.2018
3.30 PM |
|
|
ELECTRICAL |
Electrical work for Mole & Tinkering Lab in Central Workshop |
72/Elect./2018 |
1,350,213.00/- |
08.02.2018
3.30 PM |
19.01.2018
3.30 PM |
|
|
Civil |
Renovation of Lab no 104 at Ground Floor of NLT |
23/Civil/D2/2017-18/07 |
7,30,719.00/- |
29.01.2018
3.30 PM |
31.01.2018
3.30 PM |
|
|
Civil |
Renovation of Lab no. 307 at second floor of NL-II. |
23/Civil/D2/2017-18/06 |
10,35,815.00/- |
29.01.2018
3.30 PM |
31.01.2018
3.30 PM |
|
|
Civil |
Providing louver door in open duct in type-II residential flat at IIT kanpur. |
23/Civil/D2/2017-18/05 |
22,65,748.00/- |
29.01.2018
3.30 PM |
31.01.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3016. |
23/Civil/D2/2017-18/04 |
5,01,055.00/- |
29.01.2018
3.30 PM |
31.01.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 343. |
23/Civil/D2/2017-18/03 |
5,67,687.00/- |
29.01.2018
3.30 PM |
31.01.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 329. |
23/Civil/D2/2017-18/02 |
5,64,920.00/- |
29.01.2018
3.30 PM |
31.01.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 4077 with Servant quarter and Garage. |
23/Civil/D2/2017-18/01 |
12,04,355.00/- |
29.01.2018
3.30 PM |
31.01.2018
3.30 PM |
|
|
Horticulture Work |
Horticulture work in Clearance of wild growth, cutting and lifting of wood, trimming etc. in whole campus |
16/SE/HD/2017-18 |
323372.00/- |
07.02.2018
3.30 PM |
09.02.2018
3.30 PM |
|
|
Horticulture Work |
Horticulture work in Park-67 & Marriage park, Media Lab, Park in front of park-67 & MRF (B-C&D), Type-IA houses, Plantation in the campus, Maintenance & Security of Mango orchard & Nursery at IIT
Kanpur. |
15/SE/HD/2017-18 |
303879.00/- |
07.02.2018
3.30 PM |
09.02.2018
3.30 PM |
|
|
Horticulture Work |
Horticulture work in Academic area ES & E, Microscope building at IIT Kanpur |
14/SE/HD/2017-18 |
319209.00/- |
07.02.2018
3.30 PM |
09.02.2018
3.30 PM |
|
|
Civil Work |
P/L vitrified tile flooring in entire house except toilets in house nos. 218 & 234 i/c internal white washing , painting of house no. 234 |
27/C/D1/2017-18/04 |
217570.00/- |
20.01.2018
3.30 PM |
23.01.2018
3.30 PM |
|
|
Civil Work |
Repairing / painting and replacement of unserviceable duct CI & GI pipe line and replacement of toilet / bathroom fitting and fixture at GH-1 F block |
27/C/D1/2017-18/03 |
417924.00/- |
20.01.2018
3.30 PM |
23.01.2018
3.30 PM |
|
|
Civil Work |
Providing and laying storm water line and repairing of broken cement road in front of Hall-9 |
27/C/D1/2017-18/02 |
167259.00/- |
20.01.2018
3.30 PM |
23.01.2018
3.30 PM |
|
|
Civil Work |
Creating of more space for pharmacy at Health Centre |
27/C/D1/2017-18/01 |
230288.00/- |
20.01.2018
3.30 PM |
23.01.2018
3.30 PM |
|
|
ELECTRICAL |
Providing external lighting for Hall-13 at IIT Kanpur. |
73/Elect./2017 |
571,573.00/- |
18.01.2018
3.30 PM |
29.01.2018
3.30 PM |
|
|
ELECTRICAL |
Replacement of metal halide with LED light in volleyball court at old Gym. |
72/Elect./2017 |
575,670.00/- |
18.01.2018
3.30 PM |
29.01.2018
3.30 PM |
|
|
Civil work |
Carrying out of minor and Civil maintenance work in Academic area (Zone-I) |
22/Civil/D2/2017-18/04 |
53,06,998.00/- |
16.01.2018
3.30 PM |
18.01.2018
3.30 PM |
|
|
Civil work |
Carrying out of minor and Civil maintenance work in Academic area (Zone-II). |
22/Civil/D2/2017-18/03 |
41,87,619.00/- |
16.01.2018
3.30 PM |
18.01.2018
3.30 PM |
|
|
Civil work |
Day to day maintenance of building in academic area Zone -II. |
22/Civil/D2/2017-18/02 |
33,92,760.00/- |
16.01.2018
3.30 PM |
18.01.2018
3.30 PM |
|
|
Civil work |
Day to day civil maintenance of building in academic area Zone -I. |
22/Civil/D2/2017-18/01 |
38,87,760.00/- |
16.01.2018
3.30 PM |
18.01.2018
3.30 PM |
|
|
Civil work |
P/L vitrified floor tiling in house no. 215, 236, 272, 299 and 4005 |
26/C/D1/2017-18/03 |
679041.00/- |
11.01.2018
3.30 PM |
15.01.2018
3.30 PM |
|
|
Civil work |
Providing barbed wire fencing two block & back to back of block of Type-I area |
26/C/D1/2017-18/02 |
159876.00/- |
11.01.2018
3.30 PM |
15.01.2018
3.30 PM |
|
|
Civil work |
White washing and painting of room front walls C & D block all floors at Hall-5 |
26/C/D1/2017-18/01 |
174443.00/- |
11.01.2018
3.30 PM |
15.01.2018
3.30 PM |
|
|
Civil work |
Carrying out minor maintenance work in all boys and girls hostels, visitor hostel, vh extension, HC, New and old Ra hostel, New SAC, New sport complex and Director's residence |
25/C/D1/2017-18/02 |
2423032.00/- |
03.02.2018
3.30 PM |
06.02.2018
3.30 PM |
|
|
Civil work |
Carrying out maintenance & minor civil works in residences and community buildings on south side of main drive (Part-II) |
25/C/D1/2017-18/01 |
2488899.00/- |
03.02.2018
3.30 PM |
06.02.2018
3.30 PM |
|
|
Civil |
Relaiyng of damaged floor with vitrified tiles floor, providing and fixing of wiremesh door, window shutter and construction of modular kitchen in house no. 4066. |
21/Civil/D2/2017-18/06 |
4,68,486.00/- |
02.01.2018
3.30 PM |
12.01.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3061 |
21/Civil/D2/2017-18/05 |
4,01,627.00/- |
10.01.2018
3.30 PM |
12.01.2018
3.30 PM |
|
|
Civil |
Setting right of vacant house no. 3066. |
21/Civil/D2/2017-18/04 |
3,83,919.00/- |
10.01.2018
3.30 PM |
12.01.2018
3.30 PM |
|
|
Civil |
Annual repairing painting white washing of house no. 665 with Servant Quarter and Garage i/c construction of Modular Kitchen, replacement of damaged door shutter. |
21/Civil/D2/2017-18/03 |
2,88,425.00/- |
02.01.2018
3.30 PM |
05.02.2018
3.30 PM |
|
|
Civil |
Seeting right of vacant house no. 382. |
21/Civil/D2/2017-18/02 |
3,83,074.00/- |
10.01.2018
3.30 PM |
12.01.2018
3.30 PM |
|
|
Civil |
Seeting right of vacant house no. 3050. |
21/Civil/D2/2017-18/01 |
3,70,510.00/- |
02.01.2018
3.30 PM |
05.02.2018
3.30 PM |
|
|
Air conditioning |
Rejuvenation of old 2000 CFM (5.0TR) AHU by 3200 CFM (8.25 TR)/ higher capacity AHU for increased AC load at BSBE lab-13 |
32/AC/2018/339 |
230,243.00/- |
11.01.2018
3.30 PM |
15.01.2018
3.30 PM |
|
|
Air conditioning |
Rejuvenation of central Air conditioning facility in Room No. 401 IME building (Energy Analytics Lab). |
31/AC/2018/338 |
410,354.00/- |
11.01.2018
3.30 PM |
15.01.2018
3.30 PM |
|
|
Civil work |
Cleaning of under ground overhead tanks at outreach centre NOIDA |
IWD/Div-I/624 dated 28.12.2017 |
0.00/- |
08.01.2018
3.00 PM |
08.01.2018
3.30 PM |
Table of Contents |
Terms & condition |
Bid |
NOTE: Please note that e-tender portal of IITK allows the tenderers to view the tenders only, but this is an quotation can be downloaded free of cost and duly filled quoations only be submitted off lineon or before 08.01.2018 upto 3.00 PM. |
|
|
Civil Work |
Making ramp with railing to approach of new student lounge. |
20/Civil/D2/2017-18/06 |
95,416.00/- |
26.12.2017
3.30 PM |
05.02.2018
3.30 PM |
|
|
Civil Work |
Making wooden shelves and providing cupboard shutter on wall offset in PDTF Lab. |
20/Civil/D2/2017-18/05 |
2,51,257.00/- |
04.01.2018
3.30 PM |
08.01.2018
3.30 PM |
|
|
Civil Work |
Renovation of Southern Lab- 204 A. |
20/Civil/D2/2017-18/04 |
1,53,210.00/- |
04.01.2018
3.30 PM |
08.01.2018
3.30 PM |
|
|
Civil Work |
Renovation of Core Lab -107 B. |
20/Civil/D2/2017-18/03 |
2,30,832.00/- |
04.01.2018
3.30 PM |
08.01.2018
3.30 PM |
|
|
Civil Work |
Renovation of EPR Lab in SL-110. |
20/Civil/D2/2017-18/02 |
3,78,248.00/- |
27.12.2017
3.30 PM |
29.12.2017
3.30 PM |
|
|
Civil Work |
Renovation of Western lab- 103 E. |
20/Civil/D2/2017-18/01 |
3,27,927.00/- |
04.01.2018
3.30 PM |
08.01.2018
3.30 PM |
|
|
Civil work |
Setting right of vacant house no. 2004 Type-II |
24/C/D1/2017-18/05 |
333945.00/- |
09.01.2018
3.30 PM |
11.01.2018
3.30 PM |
|
|
Civil work |
Providing stands for keeping bicycles (approximately 200 cycles) near back side gate of KV IIT Kanpur |
24/C/D1/2017-18/04 |
155737.00/- |
09.01.2018
3.30 PM |
11.01.2018
3.30 PM |
|
|
Civil work |
P/L vitrified flooring with adhesive cover existing mosaic flooring of entire house except kitchen & toilets of 402 Type-IV |
24/C/D1/2017-18/03 |
146467.00/- |
20.01.2018
3.30 PM |
23.01.2018
3.30 PM |
|
|
Civil work |
P/L vitrified flooring a wire mesh shutters on external side doors / windows and internal white washing distempering and painting of 225 |
24/C/D1/2017-18/02 |
199990.00/- |
09.01.2018
3.30 PM |
11.01.2018
3.30 PM |
|
|
Civil work |
P/L vitrified tile flooring in entire house except kitchen and toilet of house no. 411 |
24/C/D1/2017-18/01 |
235732.00/- |
09.01.2018
3.30 PM |
11.01.2018
3.30 PM |
|
|
Civil work |
Providing LED light fittings, fans, wiring for fire alarm system and other associated work at fourth floor of Aerosol building. |
64/IWD/ED/424 |
4,09,655.00/- |
02.01.2018
3.30 PM |
04.01.2018
3.30 PM |
|
|
Civil work |
Replacement of damaged 400W MH lights (08 nos.) with 240W LED flood light at tennis ground as enclosed requisition. |
71/IWD/ED/426 |
2,32,114.00/- |
02.01.2018
3.30 PM |
04.01.2018
3.30 PM |
|
|
Civil work |
Modification & renovation of electrical installation for setting up laboratory in Nuclear Building 104. |
70/IWD/ED/425 |
3,40,069.00/- |
02.01.2018
3.30 PM |
04.01.2018
3.30 PM |
|
|
Civil work |
Replacement of damaged piece of cable alongwith straight through joint for restoring the DG power supply to Health Centre fed from Substation No. 2. |
67/IWD/ED/406 |
3,52,490.00/- |
02.01.2018
3.30 PM |
28.12.2017
3.30 PM |
|
|
Civil work |
Modification & renovation of electrical installation in Lab Space at IME 401. |
69/IWD/ED/421 |
417,033.00/- |
02.01.2018
3.30 PM |
04.01.2018
3.30 PM |
|
|
Civil work |
Setting right of vacant house no. 408 |
23/C/D1/2017-18/02 |
1192269.00/- |
06.01.2018
3.30 PM |
09.01.2018
3.30 PM |
|
|
Civil work |
Setting right of vacant house no. 502 |
23/C/D1/2017-18/01 |
1003563.00/- |
06.01.2018
3.30 PM |
09.01.2018
3.30 PM |
|
|
Civil work |
Providing vitrified tiles on floor and providing wire mesh shutter on external doors & windows of house no. 1075, 1076, 1077 & 1086 |
22/C/D1/2017-18/06 |
397301.00/- |
11.01.2018
3.30 PM |
15.01.2018
3.30 PM |
|
|
Civil work |
Setting right of vacant house no. 161 and 162 |
22/C/D1/2017-18/04 |
574979.00/- |
11.01.2018
3.30 PM |
15.01.2018
3.30 PM |
|
|
ELECTRICAL |
Modification & renovation of electrical installation in Lab Space in NL II 107. |
68/IWD/ED/417 |
366,898.00/- |
02.01.2018
3.30 PM |
04.01.2018
3.30 PM |
|
|
|
View Tender Archive |