Water Tunnel Test Facility
The water tunnel test facility has been set-up to undertake the flow measurements for various flow configurations at higher Reynolds numbers. Two PhD students are working full time in this laboratory. The facility has been equipped with the following instrumentations.
-
Laser Doppler Velocimeter (LDV)
-
Laser Induced Fluorescence (LIF)
-
Hotwire Anemometer
-
Load-Cell
-
Calibration unit of load-cell and anemometer.
-
Smoke visualization facility.
|